| 1. Assignment Name: Consultancy services for feasibility study, design and construction supervision of Simialele (180ha) and Konoo (120 ha) Irrigation Schemes Rehabilitation | Country: Kenya | ||||
| Location within country: Turkana County | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant | ||||
| Names of Client: Ministry of Agriculture, Livestock and Fisheries | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address:
Kilimo House, Cathedral Road P.O Box 30028 – 00100 Nairobi, Kenya |
No. Of Staff-Months; 92 months
Duration of Assignment: 18 months |
||||
| Start date:
October 2015 |
Completion date:
June 2017 Construction Supervision in progress |
Approx. Value of Services:
Ksh 21.8 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| The objective of the assignment was to provide designs for a total of 300 ha of irrigation in Simialele and Konoo Irrigation Schemes Rehabilitation
The specific objectives were: · To carry out topographical surveys at the intake sites and the whole irrigation scheme area · To carry out inventory survey of any existing irrigation infrastructure; · To carry out profile surveys for the main and Sub-main Pipelines; · Drawings and design for intakes and Pipeline including associated structures; · Prepare Costing and preparation of Tender documents; and · Prepare Terms of Reference for Construction and operation & maintenance manual to be adopted. · Carry out construction supervision after completion of design |
|||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng. Bernard Maina –Project Manager/Irrigation Engineer · Eng Peter Muthigani – Agricultural Engineer/Team Leader · Daniel Kimani – Soil and Water Engineer · Humphrey Mwathe –Water User’s Association Expert · Purity Muthoni -Environmentalist · John Njoroge – Economist · Carol Makhulungu-Surveyor · Richard Wachira – Agronomist |
|||||
| Activities carried out by our staff:
· Feasibility study for Simailele and Konoo irrigation schemes · Design of irrigation systems · Construction supervision of Simailele and Konoo irrigation schemes rehabilitation |
|||||
| 2. Assignment Name: consultancy services for the feasibility study and design of lower Murang’a integrated irrigation project (5000ha) | Country: Kenya | ||||
| Location within country: Murang’a | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant | ||||
| Names of Client: TARDA | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address:
Queensway House 7th floor, Kaunda Street P.O Box 47309 – 00100 Nairobi, Kenya |
No. Of Staff-Months; 68 months | ||||
| Start date:
May 2015 |
Completion date:
Sept. 2016 ( in progress) |
Approx. Value of Services:
Ksh 29.8 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Narrative Description of Project:
The objective of the assignment was to provide designs for 5000 ha of irrigation in Lower Murang’a integrated with mini Hydro power projects. The specific objectives were: · To carry out topographical surveys at the intake sites and the whole irrigation scheme area · To carry out inventory survey of any existing irrigation infrastructure; · To carry out profile surveys for the main and Sub-main Pipelines; · Drawings and design for intakes and Pipeline including associated structures; · Prepare Costing and preparation of Tender documents; and · Prepare Terms of Reference for Construction and operation & maintenance manual to be adopted. |
|||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng. Bernard Maina –Project Manager/Irrigation Engineer · Eng Njiru Patrick – Irrigation Engineer –Team Leader · Eng Patrick Wambuki – Civil and Dams Engineer · Humphrey Mwathe –Water User’s Association Expert · David Kiiru -Sociologist · Godfrrey Ndirangu – Economist · Carol Makhulungu-Surveyor |
|||||
| Activities carried out by our staff:
· Feasibility study for water storage pans and dams rehabilitation and expansion · Feasibility study of 5000 ha to be irrigated · Design of 5000 ha irrigation system |
|||||
|
3. Assignment Name: Consultancy services for Monitoring and Evaluation of the Expanded National irrigation Programme(ENIP) in Kenya (over 130 projects distributed across the country estimated to cover 75,000ha |
Country: Kenya | ||||
| Location within country: Countrywide | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant | ||||
| Names of Client: National irrigation Board (NIB) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: National Irrigation Board , Lenana Road, P.O Box 30372, 00100,Nairobi, | Duration of Assignment: 15 months | ||||
| Start date:
January 2014 |
Completion date:
May 2015 |
Approx. Value of Services:
Ksh 28.1 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng. Bernard Maina – Director/Project Manager/Irrigation Engineer · Humphrey Mwathe – Team leader · David Kiiru -Sociologist · Godfrrey Ndirangu – Economist · Patrick Njiru-Senior Irrigation Engineer · Peter Gathuma Ndirangu – Surveyor · Carol Makhulungu- Ass. Surveyor |
|||||
| Activities carried out by our staff:
· To monitor the progress being made in the construction of over 130 irrigation projects under the programme · Monitor quality of work · To identify the challenges facing the projects · Assess performance of completed projects in terms of efficiency impact and productivity · To propose mitigation measures to the challenges |
|||||
| 4. Assignment name: consultancy services for carrying out hydrological baseline survey in Upper Tana catchment within six counties namely Embu, Tharaka Nithi, Meru, Nyeri, Kirinyaga and Murang’a | Country: Kenya | ||||
| location within the counties: | Professional staff provided by your firm/ Entity (profiles): hydrologist, agricultural engineer, sociologist, environmentalist. | ||||
| Name of clients: International Fund for Agricultural Development (IFAD) Upper Tana Embu | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: P.O Box 996-60100 Embu | Duration of Assignment: 10 moths | ||||
| Start date: Feb 2014
completion date: Dec 2014 |
Approx. value of services Kshs: 13.8 million | ||||
| name of associated consultants : None | |||||
| name of senior staff(project Director/ coordinator, team leader) involved and functions performed:
· Eng Bernard Maina- Project manager · Dr Joseph Sang- Hydrologist/Team leader · Hannah Ngugi- Water quality specialist · Wilson Macharia- Agricultural Engineer · Evelyn Wamburu- Sociologist |
|||||
| Narrative description of project: Consultancy services for carrying out hydrological baseline survey in upper Tana catchment within six counties namely , Embu, Tharaka Nithi , Meru , Nyeri, Kirinyaga , and Murang’a | |||||
| description of actual services provided by your staff:
· To generate baseline data on water quantity , quality, and status of meteorological stations that will help in assessing the situation at the start of the project, · Set bench marks/indicators to inform the monitoring and evaluation (M&E) function of the project · Set up a Management Information System (MIS) |
|||||
| 5. Assignment Name: Environment and social impact assessment and 26.3 Km Canal way leave acquisition plan for rehabilitation and expansion of Bura irrigation scheme of total area 6000ha in Tana River county | Country: Kenya | ||||
| Location within country: Tana River county | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: National Irrigation Board (NIB) of Kenya | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: National Irrigation Board , Lenana Road, P.O Box 30372, 00100,Nairobi, | Duration of Assignment: 8 Months | ||||
| Start date:
March 2014 |
Completion date:
November 2014 |
Approx. Value of Services:
Ksh 7.1 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng Bernard Maina – Director · Dr. Rebecca Karanja – ESIA Lead expert/Team Leader · Bishar Mohamed – Irrigation Engineer · Jacob Omondi – Sociologist –RAP expert · Nicholas Kimanthi – Valuer · Samuel Kibuchi – Sociologist · Kelvin Kieru – Data Analyst |
|||||
| Narrative Description of Project:
· Undertake Environment and social impact assessment · Negotiate Canal way leave acquisition with affected communities |
|||||
| Description of actual services provided by OCRA staff:
· Feasibility study of the irrigation scheme. · Undertake Environment and social impact assessment · Negotiate Canal way leave acquisition with affected communities |
|||||
| 6. Assignment Name: Consultancy services for a Study on Opportunities and Threats for Irrigation in Kenya’s Dry-lands and preliminary identification of areas that can be irrigated | Country: Kenya | ||||
| Location within country: Turkana, Mandera, Tana River, Isiolo, Wajir, and Garissa Counties. Specific areas included ASAls along river Turkwel, Kerio, Daua and Tana, and the Merti Aquifer. | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Food and Agricultural Organisation of United Nations (FAO) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: FAO-Kenya Office, UN Avenue Giriri, Un Complex Block P Level 3, P.O Box 30470-00100 Nairobi Kenya | Duration of Assignment: 6 Months | ||||
| Start date:
July 2012 |
Completion date:
November 2012 |
Approx. Value of Services:
Ksh 7.8 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff (Project director/Coordinator, Team leader) involved and functions Performed:
· Phares K. Ragwa – Team Leader/land and water management specialist/Irr. Mgt Expert · Eng. Bernard Maina – Project Manager / Irrigation Engineer · Jeremy A.K Mbai – Agricultural Economist · Samuel Kibuchi – Sociologist · Dr. Rebecca Karanja – Environmentalist · Simon Mutie – Hydrologist |
|||||
| Narrative Description of Project:
The objective of the assignment was to develop a reference document that can be used to inform investment in irrigation within Kenya’s drylands with specific focus on the Daua, Tana, Turkwel and Kerio Rivers basins and the Merti Aquifer while providing information and recommendation on the impact of irrigation development on the existing social system. The specific objectives were: · To establish the total area suitable for open furrow irrigation along Daua, Tana, Turkwel and Kerio River basins based on the existing data on soil river flows and rainfall. · To establish the environmental viability and cost effectiveness of irrigated crop farming utilizing water from the above rivers and aquifer and based on results of above data. · To establish the potential risk of irrigated agriculture along the above rivers and the Merti aquifer. |
|||||
| Activities carried out by our staff:
· Determined the total potential crop production for the areas; · Carried out an economic viability analysis of irrigation development; · Carried out an environmental viability analysis of irrigation development; · Determined the potential impacts of irrigation development along the rivers and Merti aquifer; · Established the potential risks of irrigation development with reference to depletion of the aquifer and downstream flows, agriculture and pastoralist conflicts and the associated negative social impacts; · 30 ,000ha identified for irrigation in the 6 counties · Provided recommendations on how the positive impacts and the negative impacts can be mitigated. |
|||||
| 7. Assignment Name: Baseline survey, Topographical survey, Environmental impact assessment, and propose flood mitigation and control measures for Dadaab refugee camp (ifo2&3) in North Eastern Kenya. | Country: Kenya | ||||
| Location within country: Daadab, North Eastern province, Kenya | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant | ||||
| Names of Client: Lutheran World Federation /UNHCR) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: Lutheran World Federation , P.O Box 40870- 00100 Nairobi, Kenya | Duration of Assignment: 5 months, | ||||
| Start:
Dec 2010 |
Completion date:
April 2011 |
Approx. Value of Services:
Ksh 9.5 Million |
|||
| Name of Associated Consultants, If any: Cactus Analysis and Management Services (CACTUS) | No. of months of Professional staff provided Associated Consultants: 2 months | ||||
Name of Senior Staff (Project director/Coordinator, Team leader) involved and functions Performed
|
|||||
| Narrative Description of Project:
· Undertake a topographic survey for Ifo 2 and 3 of total area 950ha as to determine the elevations and natural and manmade features · Undertake ESIA for the area · Produce a flood map covering the study areas defining an overall strategy for flood control in the catchment over the next 10 years · Design of flood control structure with detailed costs and estimated durations of implementation including but not limited to drainage and cross drainage structures |
|||||
| Description of actual services provided by your staff:
· Undertook a topographic survey for Ifo 2 and 3 of total area 950ha and determined the elevations and natural and manmade features; · Undertook ESIA and prepared EMP for the refugee camp; · Produced a flood map covering the study areas; and · Designed flood control structure with detailed costs and estimated durations of implementation including but not limited to drainage and cross drainage structures. |
Dadaab refugee camp : ESIA Flood Assessment; 10 year return period inundation mapping | ||||
|
8. Assignment Name: Consultancy services for survey, mapping, drawing and design for 25 canals total length 253Km covering 2000 Ha along DurDur River. |
Country: Somalia | ||||
| Location within country: Baki and Garbol Districts of Awadal Region ( Northern Somalia- Somaliland) | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Food and Agricultural Organisation Somalia (FAOSO). | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: FAO Somali Office, Ngecha Rd, Nairobi Kenya | Duration of Assignment: 3 Months | ||||
| Start date:
July 2012 |
Completion date:
September 2012 |
Approx. Value of Services:
Ksh 10.5 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng. Bernard Maina – Project Manager · Peter Muthigani – Team Leader/Senior Irrigation Engineer · Moses Muriuki – Ass. Irrigation Engineer · Mohamud Mohamed – Surveyor · Jinale Mohamed – Ass. Surveyor |
|||||
| Narrative Description of Project:
The objective of the assignment was to provide designs that facilitate rehabilitation, efficient and equitable distribution of irrigation water within the schemes as well as construction of new canals. The specific objectives were: · To carry out topographical surveys at the intake sites; · To carry out profile surveys for the main and major branch canals; · Mapping of all existing structures including their conditions; · Drawing and design for intakes and canals including associated structures; and · Costing and preparation of bid documents. |
|||||
| Activities carried out by our staff:
· Topographical survey at intake sites and profile surveys for conveyance system; · Drawing, detailed design and costing; and · Preparation of reports and other deliverables. |
|||||
| 9. Assignment Name: Undertaking Feasibility study, survey and detailed design for Lokubae Irrigation Scheme. | Country: Kenya | ||||
| Location within country: Loima district, Turkana county | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: USDAF/ KARMA | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: Lodwar Kenya | Duration of Assignment: 6 months | ||||
| Start:
Jan 2012 |
Completion date:
June 2012 |
Approx. Value of Services:
KShs 7.5 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed Function:
· Eng Bernard Maina – Director / Project manager/ Senior Irrigation Engineer · Eng. Odhiambo – Hydraulics Engineer · Humphrey Mwathe – IWUA Expert / Team Leader · Bernard mirangi – ESIA Lead expert · Chris Kiplang’at – Ass. Irrigation Engineer · Samuel Kibuchi – Sociologist · Joel Maina – Agri-Economist · Wachira Ngunya – Horticulturalist · Ndirangu Samuel Gathuma – Surveyor |
|||||
| Narrative Description of Project:
Undertaking baseline survey, hydrological studies, engineering survey and design, costing and Tender document preparation. |
|||||
| Description of actual services provided by your staff:
· Feasibility study of irrigation scheme; · ESIA of the project and preparation EMP; · Engineering survey, drawing and detailed design of irrigation scheme; · Preparation of tender Documents and TOR for Construction. · Completion USDAF Forms. |
Picture taken in the scheme during feasibility Study | ||||
| 10. Assignment Name: Undertaking Feasibility study, detailed design and preparation of Tender documents for Lokwaliwa Irrigation Scheme. | Country: Kenya | ||||
| Location within country: Turkana South district, Turkana county | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: USDAF/ LYG | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: Lodwar Kenya | Duration of Assignment: 5 months, 2012 | ||||
| Start:
March. 2012 |
Completion date:
July 2012 |
Approx. Value of Services:
Ksh 5.5 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed Function:
· Eng Bernard Maina – Director / Senior Irrigation Engineer · Eng. Odhiambo – Hydraulics Engineer · Humphrey Mwathe – IWUA Expert / Team Leader · Bernard mirangi – ESIA Lead expert · Samue Kibuchi – Sociologist · Wachira Ngunya – Horticulturalist · Ndirangu Samuel Gathuma – Surveyor |
|||||
| Narrative Description of Project:
Undertaking baseline survey, hydrological studies, engineering survey and design, costing and Tender document preparation. |
|||||
| Description of actual services provided by OCRA staff:
· Capacity building; · Feasibility study of the irrigation scheme. · ESIA of the project and preparation EMP; and · Engineering survey, drawing and detailed design of irrigation scheme and · Preparation of tender Documents. |
|||||
| 11. Assignment Name: Undertaking baseline survey of water resources and irrigated agriculture within the Lake Turkana Basin (along rivers Turkwell, Kerio and Omo River.) | Country: Kenya and Ethiopia | ||||
| Location within country: Lake Turkana Basin , Turkwell, Kerio and Omo river | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: African Development Bank (AfDB) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: AfDB Tunis | Duration of Assignment: 6 months, 2010 | ||||
| Start:
Jan 2010 |
Completion date:
June 2010 |
Approx. Value of Services: Ksh 3.5 Million | |||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: 6 | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
• Eng Bernard Maina Function: Irrigation and Environmental Expert |
|||||
| Narrative Description of Project:
Undertaking baseline survey of water resources and irrigated agriculture within the Lake Turkana Basin (along rivers Turkwell, Kerio and Omo river.). The projects components were; · Livelihood improvements · Irrigation rehabilitation/expansion · Capacity building/institutional strengthening · Environmental Impact assessment |
|||||
| Description of actual services provided by your staff:
· Feasibility study of irrigation schemes within the basin ; · ESIA of the project and preparation EMP; · Design of irrigation schemes |
Undertaking EIA and preliminary survey for small holder irrigation schemes in Turkana district | ||||
| 12. Assignment Name: Bardera community pumping irrigation Project design of 500ha , water infiltration wells and sanitation along the Juba river in Bardera, Somalia | Country: Somalia , Hiran region | ||||
| Location within country: Juba river in Bardera | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Solidarities NGO | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address | Duration of Assignment: 6 months | ||||
| Start:
March 2009 |
Completion date:
Nov 2009 |
Approx. Value of Services: 75,700 USD | |||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: None | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
Bernard Maina Function: coordinate the assessment of health risks, water and sanitation needs available resources and the capacity of existing systems for settlements and urban populations. |
|||||
| Narrative Description of Project:
Implemented solidarities French NGO with funding from ECHO. The projects components were; · Design and implement water storage, treatment and distribution systems-potable/other uses · Design and implement sanitation systems for household and/or communal toilets, household liquid and solid wastes, hospital wastes and other community facilities, including drainage and vector control and in close coordination with health and education services. · Water harvesting and Irrigation rehabilitation/expansion · Capacity building/institutional strengthening |
|||||
| Description of actual services provided by your staff:
· Survey and preliminary design , · ESIA · Community strengthening |
Irrigated farm
Juba river in Somalia |
Completed infiltration wells | |||
| 13. Assignment Name: Consultancy services for Environmental and Social Impact Assessment (ESIA) for Rahole canal irrigation project of total area 3000ha | Country: Kenya | ||||
| Location within country: Garissa county | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: National Irrigation Board (NIB) of Kenya | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: National Irrigation Board , Lenana Road, P.O Box 30372, 00100,Nairobi, | Duration of Assignment: 5 Months | ||||
| Start date:
April 2012 |
Completion date:
September 2012 |
Approx. Value of Services:
Ksh 6.9 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
· Eng Bernard Maina – Director · Dr. Rebecca Karanja – ESIA Lead expert/Team leader · Bishar Mohamed – Irrigation Engineer · Phares Ragwa – IWUA Expert · Prof. Wahome – Natural Resource Management Expert · Samuel Kibuchi – Sociologist · Kelvin Keru – Data Analyst |
|||||
| Narrative Description of Project: The objective of the Survey was to reveal typical farmers’ condition and to set the baseline in the command area of the MIS scheme as a part of project benefit to be monitored.
The specific objectives were · Carry out site assessment for Environmental and social aspect consideration; · To conduct interviews with farmers (questionnaire/farm household survey); · To carry out data analysis and interpretation; and · To prepare ESIA reports and other deliverable |
|||||
| Description of actual services provided by OCRA staff:
· Feasibility study of the irrigation scheme. · ESIA of the project and preparation EMP; · Engineering survey, drawing and detailed design of irrigation scheme and Preparation of tender Documents. |
|||||
| 14. Assignment Name: -Baseline survey, Feasibility studies ESIA and design of Special Framework Agricultural Assistance Program in Middle Shabelle, Lower Shabelle and Joba of Somalia. | Country: Somalia | ||||
| Location within country: South Central Somalia along Shabelle and Juba valley | Professional Staff Provided by your Firm/Entity (Profiles): Irrigation Engineer | ||||
| Names of Client:
European Commission Somalia Office (Nairobi) |
Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: P.O Box 30475 Nairobi
Union Insurance House, Ragati Road |
Duration of Assignment: 4 months | ||||
| Start:
February 2009 |
Completion date:
May 2009 |
Approx. Value of Services: KShs 4 million | |||
| Name of Associated Consultants, If any:
None |
No. of months of Professional staff provided by Associated Consultants:
2 months |
||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed:
Eng Bernard Maina – Irrigation Engineer (Infrastructure) |
|||||
| Narrative Description of Project
EC funded, implemented by FAO, CARE CEFA and Agrosphere (Italian NGOs) – design of Special Framework Agricultural Assistance Program in Middle Shabelle, Lower Shabelle and Juba of Somalia. The project involved ; · rehabilitation of irrigated area of area 20,000 ha; · Environmental and social impact assessment(ESIA) of the project; · Capacity development and institutional strengthening; and · Improvement of agronomic practices and marketing. |
|||||
| Description of actual services provided by your staff:
Ocra company ltd was responsible for assessing the · Infrastructural component of the project; · undertaking the ESIA; · strengthening of irrigation water users association; and · Participatory irrigation management. |
|||||
| 15. Assignment Name: Wajir South water and sanitation project – Baseline survey for water and sanitation facilities | Country: Kenya | ||||
| Location within country: Habaswein – Wajir South District | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: World Vision Kenya | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: World Vision Karen office Kenya | Duration of Assignment: 2 months, | ||||
| Start:
March 2007 |
Completion date:
May 2007 |
Approx. Value of Services: KShs 700,000 | |||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
Eng. Bernard Maina, Function: Team Leader |
|||||
| Narrative Description of Project:
Baseline survey, construction of water and sanitation facilities, training. |
|||||
| Description of actual services provided by your staff:
· Carried out baseline survey; · Established monitoring indicators; · Carried out EIA. |
|||||
| 16. Assignment Name: Consultancy services for Feasibility studies, detailed design and Preparation of Tender Documents for Olopito Irrigation Scheme Development Project covering 200 ha along River Sikinder in Narok and Water supply for Narok Township. | Country: Kenya | ||||
| Location within country: Narok County | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant | ||||
| Names of Client: Japan International Cooperation Agency (JICA) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: JICA TEAM Office/SIDEMAN-SAL at Maji House, Nairobi Kenya | Duration of Assignment: 5 Months | ||||
| Start date:
December 2012 |
Completion date:
April 2013 |
Approx. Value of Services:
KShs 9.9 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff (Project director/Coordinator, Team leader) involved and functions Performed
· Eng. Bernard Maina – Director/Project Manager/Irrigation Engineer · Patrick Njiru-Senior Irrigation Engineer · Peter Gathuma Ndirangu – Surveyor · Carol Makhulungu- Ass. Surveyor |
|||||
| Narrative Description of Project:
The objective of the assignment was to provide designs that facilitate efficient and equitable conveyance and distribution of irrigation water within the schemes as well as construction of new Pipelines. The specific objectives were: · To carry out topographical surveys of the water supply and distribution systems in Narok township · To carry out detailed design for water treatment and distribution · Design for sewerage system and treatment lagoons · To carry out topographical surveys at the intake sites and the whole irrigation scheme area · To carry out inventory survey of any existing irrigation infrastructure; · To carry out profile surveys for the main and Sub-main Pipelines; · Drawing and design for intakes and Pipeline including associated structures; · Prepare Costing and preparation of Tender documents; and · Prepare Terms of Reference for Construction and operation & maintenance manual to be adopted. |
|||||
| Activities carried out by our staff:
· Carried out the feasibility study for the irrigation scheme; · Topographical survey at intake sites and profile surveys for conveyance and Distribution systems; · Drawing, detailed design and costing; · Preparation of reports and other deliverables; and · Preparation of Tender Documents. · Prepare Terms of Reference for Construction. |
|||||
| 17. Assignment Name: Feasibility study ,design and supervision of construction of Ena Farm (Fair Acres Hortec Ltd) water reservoir laying of the conveyance system, construction of greenhouses, and Installation of drip automatic system (30ha) | |||||
| Country: Kenya | Location within country: Ena | ||||
| Name of Client: Ena Farm(Fair Acres Hortec Ltd)
Contact: Farm Manager–George Gikonyo (Tel/Mobile: 0733995553/0722364213) |
No. of CollaborativeStaff:4 | ||||
| Employer Address: P.O. Box 56737,00200 | No of PersonMonths:35 | ||||
| Start Date (Month/Year): January 2010 | Completion date
(Month/Year): March2011 |
||||
| Name of
Associated Consultants: AGRICOM |
Contract Duration: Survey & Design
2Months Construction & Installations of drip system and rehabilitation of swamp-13 months |
Approx. Value of Services:
Kshs 26.4Million |
|||
| Name of Senior Staff involved and functions performed
· Eng. Bernard Maina was the engineer responsible for planning, design and overall supervision of construction; · N. Waiyaki was responsible for marketing, financial and economic analysis of the project as well as providing guidance and direction as project manager; · Jeremiah Nyori was responsible for cropping pattern development; · Simon Mutie was responsiblefor topographical survey and set-out; · Moses Muriuki was responsible for day to day supervision of the construction including farm lay out set out, signal cables, laterals and mains laying as well as drip bed set out and formation and swamp rehabilitation works; |
|||||
| Narrative Description of Project:
The project involved undertaking of topo and water resources survey, design of appropriate greenhouses and associated drip irrigation system including fertigation & automation system, business plan preparation, design of water reservoir to hold150,000m3 of water harvested from runoff and overflow from a seasonal river. The construction phase involved construction of the reservoir with surrounding compacted earth dam wall, construction of greenhouses, laying of the conveyance system and installation of drip system, rehabilitation of access roads and rehabilitation of swamp for fish production. |
Description of Actual Services provided:
The consultant was responsible for business plan development, Feasibility study, planning, and design and overall supervision. Initial farm management activities during the first production activity. |
||||
|
18. Assignment Name: Feasibility study ,design and supervision of construction of reservoir and drip irrigation system, and business plan for Sauti farm fresh produce (24ha) |
|||||
| Country: Kenya | Location within country: Thika | ||||
| Name of Client: Sauti Fresh Produce Ltd
Contact: Farm Manager–:Joseph Mutea(Tel/Mobile: 0721394851/0737289870) |
No. of Collaborative Staff: 8 | ||||
| Employer Address: P.O. Box 6013,Thika | No. of Person Months: 35 | ||||
| Start Date (Month/Year): August2010 | Completion Date (Month/Year): Dec2011 | ||||
| Name of Associated
Consultants: AGRICOM Consultants Ltd |
Contract Duration:16 months | Approx. Value of Services:
Ksh36.4Million |
|||
Name of Senior Staff involved and functions performed
|
|||||
| Narrative Description of Project:
The project involved the following:
|
Description of Actual Services provided:
The Consult Antares possible for business plan development, Feasibility study, planning, design and overall supervision. Initial farm management activities during the first production activity. |
||||
| 19. Assignment Name: Consultancy services for baseline survey (for indicators of project benefit monitoring system – farm household) for the Mwea irrigation development project, Kirinyaga County. | Country: Kenya | ||||
| Location within country: Kirinyaga county | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Nippon Koei International Consultancy Ltd. | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address:
P.O. BOX 53611-354-8301 Nairobi, Kenya |
Duration of Assignment: 4 Months | ||||
| Start date:
March 2012 |
Completion date:
June 2012 |
Approx. Value of Services:
Ksh 6.9 Million |
|||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: none | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions performed
· Eng Bernard Maina – Director · Jeremy Mbai – Agriculturalist /Team leader · Wachira Ngunya – Horticulturalist · Purity Muthoni – Environmental Expert · Ruth Taruss – Agri-economist · Kelvin N – Data Analyst |
|||||
| Narrative Description of Project:
The objective of the Survey was to reveal typical farmers’ condition and to set the baseline in the command area of the MIS scheme as a part of project benefit to be monitored. The specific objectives were · To conduct interviews with farmers (questionnaire/farm household survey); · To prepare database of the interview result; and · To prepare a draft final and final report. |
|||||
| Activities carried out by our staff
· To conduct interviews with farmers (questionnaire/farm household survey); · To prepare database of the interview result; and · To prepare a report. |
|||||
| 20. Assignment Name: Development of National Investment Profile (NIP)/Proposal for Water for Agriculture and Energy in Kenya and Undertaking Strategic Environmental Assessment(SEA) | Country: Kenya | ||||
| Location within country: Countrywide | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Food and Agricultural Organisation (FAO ) | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: FAO Kenya office | Duration of Assignment: 6 months | ||||
| Start:
Dec 2009 |
Completion date:
May 2010 |
Approx. Value of Services: KShs 2.5 Million | |||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: 4 | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
Eng. Bernard Maina, Function: Team Leader |
|||||
| Narrative Description of Project: Development of National Investment Profile (NIP)/Proposal for water for agriculture and energy in Kenya.
The projects components were; · Review of water storage status in Kenya; · Analysis of policies and strategies in water, irrigation ,agriculture and energy in Kenya; · Estimating investment needs in line with vision 2030; · Assessing the effect of climate change to the environment with respect to irrigation, water and energy sector · Preparing the National investment profile. |
|||||
| Description of actual services provided by your staff:
· Carried out a review of water storage status in Kenya; · Carried out strategic environmental assessment (SEA ); · Analyzed policies and strategies in water, irrigation ,agriculture and energy in Kenya; and · Estimated investment needs in line with vision 2030; · Carried out an assessment on the effect of climate change to the environment with respect to irrigation, water sand energy sector; and · Prepared a National investment profile for Kenya. |
|||||
| 21. Assignment Name: Preparation of Database, Baseline survey, Preliminary Investigations and Request for proposal (RFP) Documents for Irrigation Development Projects for Athi and Tana River Basin, Kenya; | Country: Kenya | ||||
| Location within country: Athi river Basin , Kenya | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: National Irrigation Board Kenya | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: NIB , Lenana Road | Duration of Assignment: 6 months | ||||
| Start: June 2010 | Completion date: Dec 2010 | Approx. Value of Services: KShs 9 Million | |||
| Name of Associated Consultants, If any: AGRICOM | No. of months of Professional staff provided Associated Consultants:
6 months |
||||
| Name of Senior Staff
· Eng Bernard Maina – Co-ordinator, · Peter Muthigani – Team leader, · Moses Muriuki – Team member |
|||||
| Narrative Description of Project:
The projects components are ; · Study and analyze irrigation development data; · Prepare a catalogue of available development information; · Establish criteria of arranging development projects in order of implementation priority; · Propose annual irrigation development areas; · Hold consultative meetings and workshops; · Carry out preliminary investigations; · Establish inputs and works required to get the projects to operational status; · Prepare an “Irrigation Development Report” with an implementation matrix; and · Prepare proposals and “Request for Proposal” (RFP) documents . |
|||||
| Description of actual services provided by your staff:
· Studied and analysed irrigation development data; · Carried out preliminary investigations for the projects identified; · Undertook Strategic Environmental Assessment(SEA); · Prepared a catalogue of available development information; · Established a criteria of arranging development projects in order of implementation priority; and · Prepared a matrix for development of established areas. |
|||||
| 22. Assignment Name: Baseline survey and water resources mapping in Aweil east and west county of South Sudan | Country: South Sudan | ||||
| Location within country: Aweil east and west | Professional Staff Provided by your Firm/Entity (Profiles): Lead Consultant & other consultants | ||||
| Names of Client: Ministry of Water Resources and Development /Save the Children | Clients Contact person for the Assignment: Eng. Bernard Maina | ||||
| Address: | Duration of Assignment: 6 months, 2007 | ||||
| Start:
February 2007 |
Completion date: July 2007 | Approx. Value of Services: 1.5 million | |||
| Name of Associated Consultants, If any: None | No. of months of Professional staff provided Associated Consultants: 4 | ||||
| Name of Senior Staff(Project director/Coordinator, Team leader) involved and functions Performed
Eng. Bernard Maina – Team Leader Function :Coordinator and water resources expert |
|||||
| Narrative Description of Project:
Implemented by ministry of water with funding from World Food program. The projects components were; · Feasibility study for water storage pans and dams rehabilitation and expansion · water storage pans and dams rehabilitation and expansion · Livelihood improvements; · Water harvesting and Irrigation rehabilitation/expansion; and · Capacity building/institutional strengthening. |
|||||
| Description of actual services provided by your staff:
· Survey and preliminary design; · ESIA; and · WUA strengthening. |
water harvesting for livestock production | Water harvesting for
smallholder irrigation in South Sudan |
|||